首页 >标准规范

GB 50996-2014地下水封石洞库施工及验收规范:英文

CODE FOR CONSTRUCTION AND ACCEPTANCE OF UNDERGROUND OIL STORAGE IN ROCK CAVERNS

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
  • 公告
收起

标准信息

  • 【主编部门】
    China Petrochemical Corporation(Sinopec Group)
  • 【批准部门】

    The Ministry of Housing and Urban-Rural Development of the People's Republic of China

  • 【发布单位】

    Ministry of Housing and Urban-Rural Development(MOHURD) and the General Administration of Quality Supervision,Inspection and Quarantine of(AQSIQ) the Pepublic of China

  • 【主编单位】

    China Railway T unnel Group Co . , Ltd .

  • 【参编单位】

    Sinopec Luoyang Petrochemical Engineering Co.,Ltd.;Sinopec Shanghai Engineering Co.,Ltd .;COOEC-ENPAL Engineering Co.,Ltd.;China Machinery Engineering & Construction Corporation;China Petroleum Engineering & Construction Corporation East China Branch;Beijing New Oriental Star Petrochemical Engineering Co.,Ltd.;Zhongnan Engineering Corporation Limited of China Hydropower Engineering;Consulting Group;Huangdao National Oil Reserve Base Co.,Ltd.;China Anneng Construction Corporation

  • 【主要起草人】

    HONG Kairong;GAO Cuncheng;JI Zhuanping;GUO Defu;ZHENG Hongzhong;G UAN Zeying;CH EN Haifeng;ZHANG Weiping;ZHOU Yang;ZHANG L;i HE Fengyou;YANG Sen;HU Dexin;ZHANG Quncheng;HE Guof;u ZHANG Chaojin;LIANG Jiany;i XU Jia;ZHAO Xiao;MIAO Guoqing;HAN Xintao

  • 【主要审查人】

    ZHOU Fengjun;ZHO U Jiaxiang;ZH U Yongquan;GE Chunyu;ZHUANG Guopei;HUANG Zuojian;WANG Ningyang;LUO Xianqi;REN Yi;YANG Xiaohong;MA Zhenming;ZHANG Lianzhong;ZHAO Fuyun;LIU Dewen

收起

中文目录

  • 中华人民共和国住房和城乡建设部公告

  • Announcement of the Ministry of Housing and Urban-Rural Development of the People’s Republic of China

  • Foreword

  • 1 General provisions

  • 2 Terms

  • 3 Basic requirements

  • 4 Construction preparations

    • 4.1 Construction investigation

    • 4.2 Technical preparations

    • 4.3 Sites and temporary works

    • 4.4 Materials preparation

  • 5 Construction survey

    • 5.1 General requirements

    • 5.2 Ground surface control survey

    • 5.3 Underground control survey

    • 5.4 Cross-section survey

    • 5.5 Breakthrough survey

    • 5.6 Storage capacity survey

  • 6 Geological prediction

  • 7 Open channels,open tunnels and tunnel portal sections

    • 7.1 Open channels

    • 7.2 Open tunnels

    • 7.3 Tunnel portal section

    • 7.4 Quality acceptance

  • 8 Excavation

    • 8.1 General requirements

    • 8.2 Excavation methods

    • 8.3 Drilling and blasting

    • 8.4 Quality acceptance

  • 9 Muck loading,unloading and transportation

    • 9.1 General requirements

    • 9.2 Muck loading,unloading and transportation

    • 9.3 Quality acceptance

  • 10 Supporting

    • 10.1 General requirements

    • 10.2 Anchor bolts and cables

    • 10.3 Shotcrete

    • 10.4 Metal meshes

    • 10.5 Steel arches

    • 10.6 Lining

    • 10.7 Pre-consolidation

    • 10.8 Quality acceptance

  • 11 Water curtain system

    • 11.1 General requirements

    • 11.2 Construction

    • 11.3 Water supply to water curtain system

    • 11.4 Quality acceptance

  • 12 Shaft construction

    • 12.1 General requirements

    • 12.2 Excavation

    • 12.3 Supporting

    • 12.4 Quality acceptance

  • 13 Grouting

    • 13.1 General requirements

    • 13.2 Grouting operations

    • 13.3 Grouting effect inspection

    • 13.4 Quality acceptance

  • 14 Ventilation,dust control,compressed-air supply,water supply and power supply

    • 14.1 Ventilation and dust control

    • 14.2 Compressed-air supply

    • 14.3 Water supply

    • 14.4 Power supply

  • 15 Drainage

    • 15.1 General requirements

    • 15.2 Construction

  • 16 Shaft equipment and pipeline installation

    • 16.1 General requirements

    • 16.2 Shaft lifting system

    • 16.3 Fabrication and installation of shaft steel structure

    • 16.4 Coating work

    • 16.5 Installation of anchor plate,casing pipe support and shaft-bottom cylinder

    • 16.6 Welding,lifting and installation of casing pipe

    • 16.7 Installation of inner pipe,pump and auxiliary devices

    • 16.8 Quality acceptance

  • 17 Paving and plugging

    • 17.1 Paving

    • 17.2 Plugging

    • 17.3 Quality acceptance

  • 18 Monitoring and measurement

    • 18.1 General requirements

    • 18.2 Measurement items and methods

    • 18.3 Processing and feedback of measurement data

  • 19 Safety,environment and health

  • 20 Project delivery and acceptance

    • 20.1 General requirements

    • 20.2 Division of construction quality acceptance units

    • 20.3 Project construction quality acceptance

    • 20.4 Procedure and organization of project construction quality acceptance

  • Appendix A Main construction methods of underground water-sealing storage cavern

  • Appendix B Test and water supply of water curtain system

  • Explanation of wording in this code

  • List of quoted standards

收起

英文目录

收起

本书术语

术语 英文名称 术语 英文名称

确定

功能项目 注册用户 普通会员 高级会员/企业版
计划版标准阅读 仅限国标条文 库内全部标准 库内全部标准
标准关联查询
强制性条文聚合
标准资源对比
术语查询
知识库管理
服务资讯查看
原版标准阅读
条文说明阅读
标准文字复制(200字/次) 100次/月 不限
标准追踪
行业定制
实用表格下载(仅PC端)
电子书与视频
专家解读视频 免费视频 免费视频 全部视频