首页 >标准规范

GB 51105-2015挤压钢管工程设备与安装与验收规范:英文

Code for Installation and Acceptance for Engineering Equipment of Extrusion Steel Pipe

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
  • 公告
收起

标准信息

  • 【主编部门】
    China Metallurgical Construction Association
  • 【批准部门】

    Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • 【发布单位】

    Ministry of Housing and Urban-Rural Dervelopment of the People's Republic of China;General Administration of Quality Supervision,Inspection and Quarantine of the People'Republic of China

  • 【主编单位】

    CHINA MCC5 GROUP CORP. LTD

  • 【参编单位】

    Special Steel Division of BAOSTEEL and MCC Tiangong Shanghai No. 13 metallurgic;Construction Corp. ,Ltd.

  • 【主要起草人】

    Zhou Jijun;Dai Zhiyi;Ran Long;Zhao Yehui;Xu Wu;Zhang Dayong;Li Jianquan;Yuan Xudong;Li Xi;Kuang Liyi;Chen Heping;Lan Jing;Li Zhifen;Wang Hong

  • 【主要审查人】

    Zhou Qin;Guo Qijiao;Li Changliang;Sun Xingli;Pang Zunfu;Yan Jiangsheng;Zhao Cong;Li Jun;Chen Hongwu;Yu Huachun;Yang Tierong;Yan Yu;Zhang Haijun;Xu Jieying

收起

中文目录

  • Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China

  • Foreword

  • 1 General Provisions

  • 2 Basic Requirements

  • 3 Equipment Foundation,Anchor Bolt and Base Plate

    • 3.1 Equipment Foundation Construction

    • 3.2 Inspection and Acceptance of Equipment Foundation

    • 3.3 Erection of Anchor Bolts

    • 3.4 Inspection and Acceptance of Anchor Bolts

    • 3.5 Erection of Base Plates

    • 3.6 Inspection and Acceptance of Base Plates

  • 4 Equipment and Materials Mobilization

    • 4.1 General Requirements

    • 4.2 Inspection and Acceptance of Equipment and Materials

  • 5 Equipment of Pipe Billet Preparation Section

    • 5.1 Installation of Short/Long Band Sawing Machine

    • 5.2 Inspection and Acceptance of Short/Long Band Sawing Machine

    • 5.3 Installation of Peeler

    • 5.4 Inspection and Acceptance of Peeler

    • 5.5 Installation of Facing Machine

    • 5.6 Inspection and Acceptance of Facing Machine

    • 5.7 Installation of Center Hole Drilling Machine

    • 5.8 Inspection and Acceptance of Center Hole Drilling Machine

    • 5.9 Installation of Deep Hole Drilling Machine

    • 5.10 Inspection and Acceptance of Deep Hole Drilling Machine

    • 5.11 Test-run of Equipment of Pipe Billet Preparation Section

  • 6 Punching and Expanding Press

    • 6.1 Installation of Base

    • 6.2 Inspection and Acceptance of Base

    • 6.3 Installation of Machine Frame

    • 6.4 Inspection and Acceptance of Machine Frame

    • 6.5 Installation of Upsetting Beam/Piercing Beam

    • 6.6 Inspection and Acceptance of Upsetting Beam/Piercing Beam

    • 6.7 Installation of Container

    • 6.8 Inspection and Acceptance of Expanding Container

    • 6.9 Installation of Manipulator

    • 6.10 Inspection and Acceptance of Manipulator

    • 6.11 Installation of Glass Powder Lubrication Table

    • 6.12 Inspection and Acceptance of Glass Powder Lubrication Table

    • 6.13 Test-run of Punching and Expanding Press

  • 7 Extrusion Press

    • 7.1 Installation of Base Board

    • 7.2 Inspection and Acceptance of Base Board

    • 7.3 Installation of Front and Back Beams

    • 7.4 Inspection and Acceptance of Front and Back Beams

    • 7.5 Installation of Pre-tensioned Column

    • 7.6 Inspection and Acceptance of Pre-tensioned Column

    • 7.7 Installation of Extrusion Beam

    • 7.8 Inspection and Acceptance of Extrusion Beam

    • 7.9 Installation of Piercing Beam

    • 7.10 Inspection and Acceptance of Piercing Beam

    • 7.11 Installation of Container

    • 7.12 Inspection and Acceptance of Extrusion Container

    • 7.13 Installation of Manipulator

    • 7.14 Inspection and Acceptance of Manipulator

    • 7.15 Installation of Main Hydraulic Cylinder

    • 7.16 Inspection and Acceptance of Main Hydraulic Cylinder

    • 7.17 Installation of Glass Powder Lubrication Table

    • 7.18 Inspection and Acceptance of Glass Powder Lubrication Table

    • 7.19 Test-run of Extrusion Press

  • 8 Auxiliary Equipment of Extrusion Line

    • 8.1 Installation of Charging Unit and Pipe Billet Cleaning Unit

    • 8.2 Inspection and Acceptance of Charging Unit and Pipe Billet Cleaning Unit

    • 8.3 Installation of Conveying Roller Table

    • 8.4 Inspection and Acceptance of Conveying Roller Table

    • 8.5 Inspection of Induction Heating Furnace

    • 8.6 Inspection and Acceptance of Induction Heating Furnace

    • 8.7 Installation of High-pressure Descaling Unit

    • 8.8 Inspection and Acceptance of High-pressure Descaling Unit

    • 8.9 Installation of Quenching Tank

    • 8.10 Inspection and Acceptance of Quenching Tank

    • 8.11 Installation of Chain Type Cooling Bed

    • 8.12 Inspection and Acceptance of Chain Type Cooling Bed

    • 8.13 Test-run of Auxiliary Equipment of Extrusion Line

  • 9 Rotary Heating Furnace

    • 9.1 Installation of Furnace Steel Structure

    • 9.2 Inspection and Acceptance of Furnace Steel Structure

    • 9.3 Installation of Feeding and Tapping Roller Table

    • 9.4 Inspection and Acceptance of Feeding and Tapping Roller Table

    • 9.5 Installation of Backup Rollers and Guide Rollers

    • 9.6 Inspection and Acceptance of Backup Rollers and Guide Rollers

    • 9.7 Erection of Rotating Steel Platform

    • 9.8 Inspection and Acceptance of Rotating Steel Platform

    • 9.9 Installation of Trolley

    • 9.10 Inspection and Acceptance of Trolley

    • 9.11 Erection of Furnace Shell

    • 9.12 Inspection and Acceptance of Furnace Shell

    • 9.13 Installation of Furnace Door and Lifting Units

    • 9.14 Inspection and Acceptance of Furnace Door and Lifting Units

    • 9.15 Test-run of Rotary Heating Furnace

  • 10 Finishing Line Equipment

    • 10.1 Installation of Pressure Straightener

    • 10.2 Inspection and Acceptance of Pressure Straightener

    • 10.3 Installation of Inclined Roller Straightener

    • 10.4 Inspection and Acceptance of Inclined Roller Straightener

    • 10.5 Installation of Pipe Cutting Band Sawing Machine

    • 10.6 Inspection and Acceptance of Pipe Cutting Band Sawing Machine

    • 10.7 Installation of Shot Blasting Machine

    • 10.8 Inspection and Acceptance of Shot Blasting Machine

    • 10.9 Installation of Tube Rolling Mill

    • 10.10 Inspection and Acceptance of Tube Rolling Mill

    • 10.11 Installation of Measuring and Weighing Marking Device

    • 10.12 Inspection and Acceptance of Measuring and Weighing Marking Device

    • 10.13 Installation of Ultrasonic Flaw-detecting Device

    • 10.14 Inspection and Acceptance of Ultrasonic Flaw-detecting Device

    • 10.15 Installation of Eddy Flaw-detecting Device

    • 10.16 Inspection and Acceptance of Eddy Flaw-detecting Device

    • 10.17 Installation of Steel Pipe Exterior Surface Polisher

    • 10.18 Inspection and Acceptance of Steel Pipe Exterior Surface Polisher

    • 10.19 Installation of Roller-hearth Solution Heat Furnace

    • 10.20 Inspection and Acceptance of Roller-hearth Solution Heat Furnace

    • 10.21 Test-run of Finishing Line Equipment

  • 11 Safety and Environmental Protection

    • 11.1 Safety

    • 11.2 Environmental Protection

  • Appendix A Classification Table of Subproject and Sub-divisional Work for Extrusion Steel Pipe Production Line Engineering Equipment Installation

  • Appendix B Quality Acceptance Record for Sub-divisional Work of Extrusion Steel Pipe Production Line Engineering Equipment Installation

  • Appendix C Quality Acceptance Record for Subproject of Extrusion Steel Pipe Production Line Engineering Equipment Installation

  • Appendix D Quality Acceptance Record for Unit Work of Extrusion Steel Pipe Production Line Engineering Equipment Installation

  • Appendix E Non-load Test-run Record for Extrusion Steel Pipe Production Line Engineering Equipment

  • Explanation of Wording in This Code

  • List of Quoted Standards

收起

英文目录

收起

公告

收起

本书术语

术语 英文名称 术语 英文名称

确定