首页 >标准规范

Design code for heating ventilation and air conditioning of industrial buildings

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
  • 公告
收起

标准信息

  • 【主编部门】
    中国有色金属工业协会
  • 【批准部门】

  • 【发布单位】

  • 【主编单位】

  • 【参编单位】

    广西广西

  • 【参加单位】

  • 【主要起草人】

  • 【主要审查人】

    亿

收起

中文目录

  • 1 

  • 2 

  • 3 

  • 4 

    • 4.1 

    • 4.2 

    • 4.3 

  • 5 

    • 5.1 

    • 5.2 

    • 5.3 

    • 5.4 

    • 5.5 线

    • 5.6 

    • 5.7 

    • 5.8 

    • 5.9 

  • 6 

    • 6.1 

    • 6.2 

    • 6.3 

    • 6.4 

    • 6.5 

    • 6.6 

    • 6.7 

    • 6.8 

    • 6.9 

  • 7 

    • 7.1 

    • 7.2 

    • 7.3 

    • 7.4 

    • 7.5 

    • 7.6 

    • 7.7 

  • 8 

    • 8.1 

    • 8.2 

    • 8.3 

    • 8.4 

    • 8.5 

  • 9 

    • 9.1 

    • 9.2 

    • 9.3 

    • 9.4 

    • 9.5 

    • 9.6 

    • 9.7 

    • 9.8 

    • 9.9 

    • 9.10 

    • 9.11 

  • 10 

    • 10.1 

    • 10.2 

  • 11 

    • 11.1 

    • 11.2 

    • 11.3 

    • 11.4 

    • 11.5 

    • 11.6 

    • 11.7 

  • 12 

    • 12.1 

    • 12.2 

    • 12.3 

  • 13 

    • 13.1 

    • 13.2 

  • A 

  • B 

  • C 

  • D 

  • F 

  • G n

  • H 

  • J 

  • K 

  • L 

收起

英文目录

  • 1 General provisions

  • 2 Terms

  • 3 Basic requirements

  • 4 Indoor and outdoor design conditions

    • 4.1 Indoor air design conditions

    • 4.2 Outdoor air design conditions

    • 4.3 Solar irradiance in summer

  • 5 Heating

    • 5.1 General requirements

    • 5.2 Heating load calculation

    • 5.3 Radiator heating

    • 5.4 Hot water radiant heating

    • 5.5 Gas-fired infrared heating

    • 5.6 Warm air heating and warm air curtain

    • 5.7 Electric heating

    • 5.8 Heating pipeline design

    • 5.9 Heating metering and control

  • 6 Ventilation

    • 6.1 General requirements

    • 6.2 Natural ventilation

    • 6.3 Mechanical ventilation

    • 6.4 Emergency ventilation

    • 6.5 Heat insulation and cooling

    • 6.6 Exhaust hood

    • 6.7 Duct design

    • 6.8 Equipment selection and layout

    • 6.9 Fire protection and explosion proofing

  • 7 Dust removal and cleaning of harmful gas and vapor

    • 7.1 General requirements

    • 7.2 Dust removal

    • 7.3 Cleaning of harmful gas and vapor

    • 7.4 Equipment layout

    • 7.5 Exhaust vertical pipe

    • 7.6 Dust inhibition

    • 7.7 Transportation of dust

  • 8 Air conditioning

    • 8.1 General requirements

    • 8.2 Load calculation

    • 8.3 Air system

    • 8.4 Space air diffusion

    • 8.5 Air handling

  • 9 Heating&cooling source

    • 9.1 General requirements

    • 9.2 Compression-type water chiller

    • 9.3 Lithium-bromide absorption-type water chiller

    • 9.4 Heat pump

    • 9.5 Evaporative water chiller

    • 9.6 Combined coolheat and power

    • 9.7 Thermal storage

    • 9.8 Heat exchanger

    • 9.9 Hot&chilled water system and condensed water system

    • 9.10 Cooling water system

    • 9.11 Refrigeration and heating room

  • 10 Mine air conditioning

    • 10.1 Mine air heating

    • 10.2 Mine air cooling

  • 11 Monitor and control

    • 11.1 General requirements

    • 11.2 Transducer and actuator

    • 11.3 Monitor and control of heating system

    • 11.4 Monitor and control of ventilation system

    • 11.5 Monitor and control of exhaust gas cleaning system

    • 11.6 Monitor and control of air conditioning system

    • 11.7 Monitor and control of heating and cooling source

  • 12 Noise reduction and vibration isolation

    • 12.1 General requirements

    • 12.2 Noise reduction and sound insulation

    • 12.3 Vibration isolation

  • 13 Heat insulation and corrosion prevention

    • 13.1 Heating insulation

    • 13.2 Corrosion prevention

  • Appendix A Outdoor air design conditions

  • Appendix B Simplified statistic methods for outdoor air design temperature

  • Appendix C Global solar irradiance for summer

  • Appendix D Solar irradiance through standard window glass for summer

  • Appendix F Heat loss for heating cold air infiltrated through gaps of doors and windows through gaps of doors and windows

  • Appendix G Orientation correction factor for cold air infiltration

  • Appendix H Calculation of natural ventilation

  • Appendix J Calculation of local air supply system

  • Appendix K Minimum velocity in the dust removal pipe

  • Appendix L Capacity of ice storage equipment and standard rating of duplex refrigerating machine

  • Explanation of wording in this code

  • List of quoted standards

收起

公告

<div> <h2></h2> <div class="text-info"> 4-4 0-0 0 </div> <div class="align-center"> <span class="bold">822</span> </div> <div class="align-center"></div> <div>GB 50019-2015201621<a data-anchorid="5.4.12">5.4.12</a><a data-anchorid="5.5.2">5.5.2</a><a data-anchorid="5.7.4">5.7.4</a><a data-anchorid="5.8.17">5.8.17</a><a data-anchorid="6.1.13">6.1.13</a><a data-anchorid="6.2.2">6.2.2</a><a data-anchorid="6.3.2">6.3.2</a><a data-anchorid="6.3.10">6.3.10</a><a data-anchorid="6.4.7">6.4.7</a><a data-anchorid="6.9.2">6.9.2</a><a data-anchorid="6.9.3">6.9.3</a><a data-anchorid="6.9.9">6.9.9</a><a data-anchorid="6.9.12">6.9.12</a><a data-anchorid="6.9.13">6.9.13</a><a data-anchorid="6.9.15">6.9.15</a><a data-anchorid="6.9.19">6.9.19</a><a data-anchorid="6.9.30">6.9.30</a><a data-anchorid="8.5.6">8.5.6</a><a data-anchorid="9.1.2">9.1.2</a><a data-anchorid="9.4.4">9.4.4</a>4<a data-anchorid="9.7.12">9.7.12</a><a data-anchorid="9.11.3">9.11.3</a><a data-anchorid="10.2.12">10.2.12</a><a data-anchorid="11.2.11">11.2.11</a><a data-anchorid="11.6.7">11.6.7</a><a data-linktoid="GB 50019-2003">GB 50019-2003</a></div> <div></div> <div class="align-right"> <span class="bold"></span> </div> <div class="align-right"> <span class="bold">2015511</span> </div> </div>
收起

本书术语

术语 英文名称 术语 英文名称
industrial building activity area
work site explosive gas atmosphere
dry-type collection 湿 wet separation
industrial air conditioning system comfort air conditioning
zoning two-pipe water system 湿 two fluid humidification

确定