首页 >标准规范

GB 50215-2015煤炭工业矿井设计规范:英文

CODE FOR DESIGN OF MINE OF COAL INDUSTRY

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
  • 公告
收起

标准信息

  • 【主编部门】
    China Coal Construction Association
  • 【批准部门】

    The Ministry of Housing and Urban-Rural Development of the People’s Republic of China

  • 【发布单位】

    Ministry of Housing and Urban-Rural Development of the People’s Republic of China;General Administration of Quality Supervision,Inspection and Quarantine of the Pepublic of China

  • 【主编单位】

    CCTEG Nanjing Design and Research Institute;Survey and Design Committee of China Coal Construction Association

  • 【参编单位】

    Ji'nan Design and Research Institute Co.,Ltd. of Coal Industry;China Coal International Engineering Group Beijing Huayu Engineering Co.,Ltd.;China Coal Handan Design Engineering Co.,Ltd.;CCTEG Chongqing Design and Research Institute;Hefei Design and Research Institute of Coal Industry;CCTEG Wuhan Design and Research Institute;Taiyuan Design and Research Institute of Coal Industry;CCTEG Shenyang Design and Research Institute;China Coal Xi'an Design Engineering Co.,Ltd.;Zhengzhou Design and Research Institute of Coal Industry

  • 【主要起草人】

    YU Weiqin;HE Guowei KANG;Zhongjia;LI Gengwu;KONG Xiangguo;YANG Xingquan;XU Hongming;FU Xiaomin;LI Dechun;ZHOU Xiulong;WANG Rongxiang;ZENG Tao;FENG Jingtao;LU Yihong;LIU Xiaoqun;LIU Yanjie;WU Yuqun;PAN Jiyi ZHANG Jilu;LI Xianchun;ZHANG Xiaosi;WANG;Yaowen LI Dingming ZHANG Yunlu;ZHANG Bo;ZHANG Ke;LI Qibin;QING Endong ZHANG Gang;LYU Changmin;DONG Jibin;HE Shan;WU Rui;BAI Hongbin;LIN Jin;YU Xinsheng;WANG Xianfeng;ZHANG Shihe;YAN Fuzhi;YIN Tongwei;SHEN Jianhui;LU Guijiu;SHI Xianru;CHEN Gang SUN Guanghui TANG;Mingguang

收起

中文目录

  • NOTICE

  • 中华人民共和国住房和城乡建设部公告

  • Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China

  • Foreword

  • 1 General provisions

  • 2 Mine resources/reserves,designed production capacity and service life

    • 2.1 Mine resources/reserves

    • 2.2 Mine designed production capacity and service life

  • 3 Minefield development

    • 3.1 Development mode

    • 3.2 Shaft location and division of mining levels

    • 3.3 Layout of development roadways

    • 3.4 Mining sequence and division of mining districts

  • 4 Shaft,shaft bottom and chambers

    • 4.1 Shaft

    • 4.2 Shaft bottom

    • 4.3 Main chambers

  • 5 Underground mining

    • 5.1 Layout of mining district

    • 5.2 Mining method and technology

    • 5.3 Layout of roads in mining districts

    • 5.4 Roadway drivage and its mechanization

  • 6 Underground transportation

    • 6.1 General requirements

    • 6.2 Coal transportation

    • 6.3 Auxiliary transportation

    • 6.4 Transportation equipment and vehicle allocation

  • 7 Ventilation and safety

    • 7.1 Ventilation

    • 7.2 Gas aspiration

    • 7.3 Underground fire prevention

    • 7.4 Prevention of mine heat damage

    • 7.5 Underground emergency refuge system

  • 8 Main mine fixed equipment

    • 8.1 Hoisting equipment

    • 8.2 Ventilation equipment

    • 8.3 Dewatering equipment

    • 8.4 Air compressing equipment

    • 8.5 Gas aspiration equipment

    • 8.6 Nitrogen injection equipment

  • 9 Surface production system

    • 9.1 General requirements

    • 9.2 Shaft head layout

    • 9.3 Shaft head coal bunker

    • 9.4 Screening,rock pick out and crushing

    • 9.5 Belt conveyor transportation

    • 9.6 Storage and loading

    • 9.7 Weighing and coal quality inspection

    • 9.8 Disposal of rock and dirty coal

    • 9.9 Mine repairing workshop and timber processing room

  • 10 General layout

    • 10.1 Mine surface general layout

    • 10.2 Industrial compound plan layout

    • 10.3 Flood control and vertical design

    • 10.4 Inside transportation

    • 10.5 Comprehensive layout of pipelines

  • 11 Surface transportation

    • 11.1 General requirements

    • 11.2 Railway with standard gauge

    • 11.3 Outside roads

  • 12 Power supply and distribution

    • 12.1 General requirements

    • 12.2 Power supply source

    • 12.3 Voltage and electric power quality

    • 12.4 Electric load

    • 12.5 Surface power distribution

    • 12.6 Underground power distribution

    • 12.7 Lighting

    • 12.8 Lightning protection,overvoltage protection and earthing

  • 13 Information and automation

    • 13.1 General requirements

    • 13.2 Monitoring and automation

    • 13.3 Computer network

    • 13.4 Information management

    • 13.5 Communication

    • 13.6 Signaling

  • 14 Surface structure

    • 14.1 General requirements

    • 14.2 Main industrial buildings and structures

    • 14.3 Construction area

  • 15 Water supply,water drainage,heat supply and ventilation

    • 15.1 Water sources

    • 15.2 Water supply and drainage

    • 15.3 Underground fire fighting water spray

    • 15.4 Heat supply and ventilation

    • 15.5 Mine shaft freeze-proof

    • 15.6 Boiler room

    • 15.7 Mine gas utilization and fuel gas

  • 16 Energy saving and emission reduction

    • 16.1 General requirements

    • 16.2 Minefield development and mining

    • 16.3 Main mine equipment

    • 16.4 Energy saving of safety facilities

    • 16.5 Electric energy saving

    • 16.6 Energy saving of surface production system

    • 16.7 Energy saving of architecture and general layout and surface transportation

    • 16.8 Energy saving of water supply and drainage,heating and ventilation

    • 16.9 Energy saving of environment facilities

    • 16.10 New energy sources

    • 16.11 Energy measuring and consumption index

    • 16.12 Comprehensive utilization

  • 17 Environment protection

    • 17.1 General requirements

    • 17.2 Pollution control

    • 17.3 Ecological protection

  • 18 Construction period

    • 18.1 Standard of turn-over

    • 18.2 Construction progress

    • 18.3 Construction period

  • Appendix A Classification of solid mineral resources

  • Appendix B Coal resources/reserves estimation index

  • Appendix C Classification and calculation of resources/reserves in prefeasibility study,feasibility study and preliminary design of mine

    • C.1 Classification and calculation of mine resources/reserves based on detailed geological reports

    • C.2 Classification and calculation of resources/reserves based on exploration geology report in preliminary feasibility study of mine

  • Appendix D Proposed ratio of resources/reserves

  • Explanation of wording in this code

  • List of quoted standards

收起

英文目录

收起

公告

中华人民共和国住房和城乡建设部公告

5-50-00
2022年 第43号
住房和城乡建设部关于发布《印制电路板工厂设计规范》等5项工程建设标准英文版的公告
该5项工程建设标准英文版由住房和城乡建设部组织中国计划出版社有限公司出版发行。
中华人民共和国住房和城乡建设部
2022年3月28日
收起

本书术语

术语 英文名称 术语 英文名称

确定